 |
 |
 |
 |
| The Wall; Christmas 2000 |
Wall opened to check for wires and pipes |
Same wall looking toward front door |
Nothing left but the beams |
 |
 |
 |
 |
| Temporary wall; we still had services |
Additional supports in the basement |
Dave Fabiano, our contractor |
The wall is gone! Praise the Lord! |
 |
 |
 |
 |
| Bringing in the "Superlift" |
Heavy lifting |
A well deserved break |
Making a snow ramp for the truck |
 |
 |
 |
 |
| The steel beam arrives |
Just slide it in! |
It's very long |
Lifting the beam into place |
 |
 |
 |
 |
| Still lifting |
Beam is up! Remove the lifts |
Just as heavy on the way out! |
New beam and supports |
 |
 |
 |
 |
| Size of the work area |
Covering the beam |
Dave removes plastic from the work area |
Work area disappears |
 |
|
|
|
| Temporary wall removed; more work to come... |
|
|
|